top of page

When Should a Commercial Building Remove Snow From a Flat Roof?

  • Caleb Cook
  • 2 days ago
  • 2 min read

A flat commercial roof should be cleared when accumulated snow approaches roughly half of the roof design snow load, when drifting has piled snow against parapets or rooftop units, or any time the drains are buried and a thaw is on the forecast. Depth by itself is a poor trigger, because wet settled snow can weigh three to four times what the same depth of dry powder weighs. Dodd Roofing and Exteriors services flat roofs in Fargo, West Fargo, Moorhead and Horace, and we plan removal around weight and drainage rather than inches.

How much weight is actually up there?

Fresh powder is light, settled snow is heavier, and compacted snow with an ice layer is heaviest. A foot of dry snow can weigh less than three inches of saturated snow. A building that looked fine in December can sit near its limit in January after a thaw and refreeze. If you do not know your design load, the structural drawings or the original permit set will list it. Our post on how much snow a roof can hold walks through the numbers.

What are the warning signs of overload?

Interior signs usually come first. Doors or windows that suddenly bind, new cracks in drywall or masonry, bowed ceiling tiles, sprinkler heads dropping below the ceiling grid, and creaking or popping from the deck. Standing water where it never used to stand is another. If you see these, clear the area below and get a structural engineer involved before anyone climbs up.

Why do buried drains matter more than depth?

A flat roof is built to drain, not to store. When internal drains and scuppers freeze or clog, meltwater ponds on the membrane, and water weighs far more than snow at the same depth. A blocked drain during a warm spell can load a roof faster than the storm that dropped the snow. Clearing a wide path around every drain and scupper is usually the highest value hour spent on the roof.

How is snow removed without damaging the membrane?

Plastic shovels and roof rakes only, never metal blades, picks, torches or rock salt. Leave two to three inches of snow as a cushion so nobody gouges the membrane. Work in even strips instead of stripping one end and leaving the other loaded, which creates an unbalanced condition worse than the original. Watch the drop zone below. This is work for a crew that knows single ply and modified bitumen, which is why owners call our commercial roofing team.

What should be done before the snow flies?

Fall is when this gets cheap. Clear the drains, confirm the scuppers are open, seal flashings and seams, check parapet caps, and note where drifts formed last year so you know where to look first. Our commercial winter prep checklist has the full list. If you manage a building in the FM metro and are not sure where your roof stands, call Dodd Roofing and Exteriors at (701) 831-0710.

Recent Posts

See All
When Is Hail Season in North Dakota?

Hail season in North Dakota runs May through August and peaks in June and July. Here is how to tell if hail hit your address and when to book a pre season inspection.

 
 
 

Comments


bottom of page